Chemical Plant — Eliminated Creep and Leakage
A chemical plant handling acids and solvents (fortune 500 chemical company)
Conventional PTFE gaskets on heat exchanger flanges were replaced every 6 months due to creep deformation and leakage. High temperatures and pressure cycling caused cold flow, bolt torque loss, and leakage. Maintenance cost: $5,000 per flange per year.
Replaced with expanded PTFE sheet, custom cut to gasket shape. The soft, conformable material filled flange irregularities. Low bolt torque required.
Zero leakage for 18 months. No bolt re-torquing required. Creep eliminated. Estimated cost savings: $7,500/year per flange.